Laserfiche WebLink
L <br /> Well Destruction Work Plan Advanced Environmental Concepts,Inc. <br /> L Health & Safety Plan <br /> for <br /> LRobert Bogetti & Sons Property 700 West Linne Road <br /> County of San Joaquin i Tracy, California <br /> Introduction: <br /> A Site Safety Plan (SSP) has been designed to address safety provisions needed during the site soil <br /> assessment/remediation. Its purpose is to provide established procedures to protect all on-site personnel from <br /> direct skin contact, inhalation, or ingestion of potentially hazardous materials that may be encountered at the <br /> site. The SSP establishes personnel responsibilities, personal protective equipment standards, <br /> decontamination procedures and emergency action plans. <br /> Advanced Environmental Concepts, Inc. seeks to enter the property described above for the purpose of <br /> abandoning three existing groundwater monitoring wells. <br /> Drilling equipment will be brought to the site and operated by: <br /> SBBS Environmental Drilling <br /> 7756 Floradora <br /> Fresno, California 93727 <br /> (209) 252-9460 <br /> C57 560175 <br /> This SSP describes means for protecting all on-site personnel from deleterious contamination of personal injury <br /> while conducting on-site activities. As described below,we will strive to meet all requirements promulgated by <br /> the'California Department of Health Services. <br /> Responsibilities of Key Personnel: <br /> „ All personnel on-site will have assigned responsibilities. Mr.Jonathan Buck will serve as Project Manager and <br /> on-site Engineer. He will also serve as Site Safety Officer(SSO). As SSO, Mr. Buck will assure that on-site <br /> personnel have received a copy of the SSP. Personnel will be required to document their full understanding <br /> of the SSP before admission to the site. Compliance with the SSP will be monitored at all times by the SSO. <br /> Appropriate personal protective equipment, listed below,will be available and utilized by all on-site personnel. <br /> Prior to beginning work, the SSO will conduct a training session to assure that all are aware of safe work <br /> practices. In the training session, personnel will be made aware of hazards at the site and will utilize Material <br /> Safety Data Sheets for information on compounds to be encountered. <br /> Mr.Buck will also be responsible for keeping field notes,collecting and securing samples, and assuring sample <br /> integrity by adherence to Chain-of-Custody protocol. <br /> Project: AEC 99V-1950 1 <br /> r <br />