My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
10200
>
2900 - Site Mitigation Program
>
PR0527792
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 2:31:46 PM
Creation date
3/4/2020 2:26:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0527792
PE
2950
FACILITY_ID
FA0018840
FACILITY_NAME
CITY OF STOCKTON
STREET_NUMBER
10200
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
NONE
CURRENT_STATUS
02
SITE_LOCATION
10200 LOWER SACRAMENTO RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Sacramento Office: • Main Office:(530)887-1494 <br /> 2491 Boatman Ave • West.Sacramento,CA 95691. 1 1521 Blocker Drive;Suite 110• Auburn,CA 95603 <br /> • s <br /> (916)375-8706 • Fax:(916)375-8709 West Sacramento Office: (916)375-8706 <br /> - ......... ... ........... ......... <br /> Geotechnical • Construction Services • Forensics <br /> File No. 879.5 <br /> May 7, 2010 <br /> Mr. Matt Satow <br /> Mark Thomas & Co., Inc. <br /> 7300 Folsom Boulevard, Suite 20.3 <br /> Sacramento, CA 95826 <br /> Subject: GEOTECHNICAL REPORT <br /> Lower Sacramento Road/UPRR'Underpass_ <br /> and Bear Creek Bridge Replacement <br /> Stockton, California <br /> Dear Mr. Satow, <br /> Blackburn Consulting(BCI) is pleased to submit this Geotechnical Report for the Lower <br /> Sacramento Road/UPRR Underpass and Bear Creek Bridge'Replacement Project. BCI prepared <br /> this report in accordance with our December•10, 2007 Subconsultant Amendment 1 to our <br /> original May 2, 2006 agreement. <br /> This report defines the geotechnical conditions as evaluated from field and laboratory test data <br /> and provides geotechnical recommendations for project design and construction. BCI prepared <br /> separate Foundation Reports for design and construction of the bridge structures. <br /> Please call if you have questions or require additional information: . <br /> Sincerely; <br /> BLACKBURN CONSULTING <br /> Reviewed By: fESSJ{� � <br /> ANo.GE 2843 <br /> ' <br /> CFERTIRE <br /> ( GINEFIN <br /> - <br /> c ( Tco ► <br /> W. Eric Nichols, C.E.G. OF C David J. Morrell, G.E. <br /> Senior Project Manager Senior Project Manager <br /> Copies: 6 bound to addressee <br />
The URL can be used to link to this page
Your browser does not support the video tag.