Laserfiche WebLink
City of Stockton sites <br /> Page 2 <br /> 1740 Houston <br /> Three additional monitoring wells (MW-6, MW-7, and MW-8) were { <br /> installed in October 2000 to evaluate the extent of the MTBE contaminant <br /> plume. AGE presented the laboratory results at the meeting but the QMR <br /> has not been submitted to PHSIEHD at this time. It was agreed that at <br /> least two additional QMR would be required before deciding the next step <br /> that would be needed to bring this site to closure. PHSIEHD also requires . <br /> the continuation of analyses for diesel in addition to the oxygenates in the <br /> quarterly sampling. <br /> 1465 S. Lincoln <br /> Preparation of the request to the Central Valley Regional Water Quality . <br /> Control Board for concurrence on a "no further action required" <br /> k <br /> determination for the 12,000 gallon UST removed from this site is j <br /> pending. The PHSIEHD staff reviewing the closure plan for the 10,000 <br /> gallon UST piping stated that the end of the piping still has not been <br /> located. PHSIEHD requires locating the piping before the closure in place 1 <br /> of the piping can be approved. AGE has proposed to video the piping to t <br /> determine its location and is to schedule this work with PHSIEHD. <br /> A meeting with the City of Stockton to discuss the status of.their sites at that time <br /> is scheduled for 10:00 a.m. on March 16, 2001, at the offices of PHSIEHD- <br /> If you have any comments or questions contact Margaret Lagorio at (209) 468- <br /> 3449 or the PHSIEHD site manager. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division ' <br /> Margaret LagorioREHS <br /> Site Mitigation Unit <br /> c: CVRWQCB - Marty Hartzell <br /> AGE - Bill Little <br /> ATC - Jeanne Homsey <br /> i <br />