f <br /> 3780 Linne Rd. Chronology <br /> Page 2 <br /> concludes it is unlikely measurable impact would ever be made on any <br /> nearby domestic well from the Sinclair plume. <br /> 09/30/02 GTI report "Third Quarter 2002 Groundwater Monitoring Report" submitted <br /> this date; GTI requested closure of the site. <br /> 03/03/03 SJCIEHD denied the request for closure; directed submittal of a Site <br /> Conceptual Model, Feasibility Study and work plan to complete the site <br /> investigation. <br /> 06/18/03 GTI report "Initial Site Conceptual Model" submitted this date. <br /> 06/25/03 GTI report "Feasibility Study" submitted this date. <br /> 11/10/03 Beginning date of a geoprobe investigation to define the lateral extent of <br /> the soil contamination in preparation for remediation by overexcavation. <br /> One additional shallow groundwater monitoring well, MW-5, was installed. <br /> See GTI report "Additional Site Characterization" dated February 20, 2004. <br /> 04/26/04 GTI report "Feasibility Study Addendum (Cost Comparisons)" submitted <br /> this date. <br /> 07/12/04 GTI report "Addendum to the Site Conceptual Model, Feasibility Study and <br /> Corrective Action Plan" submitted this date. <br /> 02/07/05 Monitoring well MW-1 was destroyed in preparation for site remediation by <br /> overexcavation. <br /> 02/23/05 Beginning date of remediation of contaminated soil at the site by <br /> overexcavation and removal. The excavation continued for three days. <br /> Clean overburden soil was kept separated from dirty soil. Contaminated <br /> soil was hauled off for disposal. Soil samples were collected from the <br /> bottom and sidewalls of the excavation. See GTI "Remedial Action Report" <br /> dated August 11, 2005. <br /> 03/11/05 Installation of replacement monitoring well MW-1R. Routine quarterly <br /> groundwater monitoring and sampling has continued at the site throughout <br /> the duration of the investigation and remediation. <br /> 11/04/05 GTI report "Revised Remedial Action Report" submitted this date. <br /> Approximately 400 cubic yards of soil was excavated from the site; some <br /> contaminated soil was left behind due to disapproval from the State Water <br /> Resources Control Board Cleanup Fund to do a complete removal. The <br /> remediation removed as much contamination as could be removed and <br /> stay within the restrictions imposed by the Cleanup Fund. <br /> 01/05/07 Soil Gas Survey performed this date. Six probes were advanced; one <br /> probe had benzene and TPH concentration above ESL's. This point was <br /> located near shop in an area where known soil contamination was left <br /> behind. One additional probe was advanced near by; no benzene or TPH. <br /> See GTI 'Report— Soil Gas Survey" dated January 29, 2007. <br />