Laserfiche WebLink
FT - JAN-27-0000 03:42 FROM GEOL03ICAL TECHNICS TO 4540138 P..04 I <br /> Georogiad. <br /> -ras std s <br /> Madam,ca& ndd so$l <br /> I <br /> December 11, 1940 <br /> Project No. 32Q.2 <br /> Protect Name: Del-Tech(Sinclair) <br /> Mr.Ron Rowe <br /> San Joaquin Coutlty Public Health Services <br /> Euvironmental Health Mision <br /> 445 San Joaquin Street <br /> P.O_Box 200 <br /> Stockton,CA 95241 3 <br /> Re: Follow-up to 12/6!96 Planning Meeting <br /> Sinclair Trucking,3780 West Linne R.oad,Tey,CA <br /> Dear Mr.Rowe: <br /> The fvilowiug is a summary of our site meeting at Sinclair Trucking on December 6, 1996. The <br /> subject discussed was the next phase of wok to be performed w fudh,cr define the lateral and vertical <br /> w=t of groundwater impacted by gasoline released from the former UST_ <br /> • The existing well's (monitoring and domestic) to be placed on a monthly groundwater level <br /> measurement and quarterly for groundwater monitoring and testing. <br /> Plan and install three(3)neer groundwater monitoring wells. The location of these are described <br /> below: 6.04ss. <br /> 1. One well 4gtadient of the source(the tank area)_ <br /> 2. Second well down gradient of the source: <br /> 3. Third well between the source acid the domestic well- <br /> A groundwater monitoring is scheduled for this month and a report will be submitted within 3 Q days <br /> of receipt of the lacy test results. After the monitoring report has been evaluated, we will discuss the <br /> new well installation project Subsequently,:a work plan will be submitted proposing the locations <br /> and construction and testing metbods for this work. <br /> if you have any questions please contact me. <br /> I <br /> ResQectfully, <br /> O-EOLOGICAL?EC"C5 M <br /> j <br /> Raynold 1.Kablanow ll,Ph.T1. <br /> RGiHGMA <br /> cc: Don Light-Del-Tech <br /> C,�aaftdvpfom~3zaz= U&C <br /> TOTAL P.04 <br /> w <br />