Laserfiche WebLink
• i <br /> DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> tf7.lEGT Ni4M ' �rat�Tc�a�nMme£A4AL�fSIS'PERli:4fl�Ea'' TI�H-Gas,1 TrX ' <br /> 37 'L AtAt £"llUIE. 7, <br /> to is 1 BAIL Eli BLAI' . ... >: <br /> N4LItlC <br /> !1 �t�1IlEf>I i SHI18 ... .: <br /> ' LIENT: DEL-TECH /GTI ATE: 06/23/1995 <br /> PROJECT MANAGER: DON /TIM SAMPLE LOCATION: MW-1 <br /> ' AMPLER: DON LIGHT TART TIME: <br /> ROUNDWATER: XXX ADOSE: THER: P.I.D WELL HEAD READING 940 PPM <br /> ' ASING ELEVATION: (FEET MSL) ASING DIAMETER: 2 INCH <br /> DEPTH TO WATER: 9.83 FEET CALCULATED CASING VOLUME: 1.65 GAL, <br /> ' DEPTH OF WELL: 19.95 FEET ITOTAL VOLUME PURGED: 8.0 GAL. <br /> TIAIIE �01„��IIIE ' :: <br /> E ...............1COLO# OTNEII:t <br /> # . .. tiAr�nlhoCM <br /> 7.3 3.25 22.9 LT, TURBID GAS ODOR <br /> ' 2.0 7.4 3.27 20.8 SANDY " <br /> 4.0 7.4 3.24 20.6 CLEAR " <br /> 6.0 7.4 3.22 20.6 " <br /> 8.0 7.4 3.22 20.5 " <br /> PURGE METHOD : CENTRIFUGAL PUMP. <br /> SAMPLE METHOD: l' STAINLESS STEEL BAILER. <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: 9.88' <br />' WELL INTEGRITY: CAP AND SEAL ARE SECURE, LOCK IS INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: CLEAR SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX. <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: NORTHERN. <br />' CONTAINMENT: D.Q.T. 17 DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0 & 7.0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />