Laserfiche WebLink
' eolo kalTeck�s! <br /> � $ fi'�' Page 7 <br /> Sinclair Trucking <br /> SCM&CAP Addendum <br /> Project No. 1030.3 <br /> July 12,2004 <br /> the only zone requiring bench-scale testing or does any zone that may be impacted <br /> require testing? Do you have a list of labs that can do the tests, etc? <br /> • The extended monitoring program that would be required by SJC/EHD far exceeds the <br /> expectations of the RP for timely remediation. <br /> • Waste discharge permitting would add time to the project. <br /> ' 3.0 SCHEDULE & REPORTING <br /> ' Geological Technics Inc. anticipates beginning fieldwork no later than 45 days after work <br /> plan approval and cost pre-approval by the USTCFP. The information gathered during this <br /> phase of work will be presented in a report, which will include a summary of the geology as <br /> ' well as the results of sample analyses. Dr. Ray Kabianow, a registered professional <br /> geologist, will supervise the project. Copies of the report will be forwarded to the <br /> appropriate County and State regulatory agencies (SJC/PHS EHD and CRWQCB). <br /> ' 4.0 SIGNATURES & CERTIFICATION <br /> ' Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This addendum and corrective actionlan was as prepared by: <br /> C <br /> t �w <br /> Eric L. Price <br /> Geologist <br /> Q�pFE551p�� <br /> mow° c`�o <br /> R.I.KABL+4!`�Ow li r� <br /> ' Raynold I. Kablanow II, Ph.D. <br /> R.G #5234, CHG #442 NO.5234 <br /> �T�rFOF CALtF���`P <br />