Laserfiche WebLink
Geological rechnicsW. Page 5 <br /> Groundwater Monitoring Report <br /> Project No. 1030.2 <br /> April 19,2004 <br /> ' 3.0 RECOMMENDATIONS <br /> • GTI is in the process of reevaluating the Feasibility Study and Corrective Action Plan <br /> submitted on June 25, 2003. <br /> ' • After review and adaptations to the June 25, 2003 report are completed, it will be <br /> resubmitted to SJC PHS/EHD for consideration. <br /> • Continue quarterly groundwater monitoring. <br /> 4.0 LIMITATIONS <br /> This report was prepared in accordance with the gene <br /> rally accepted standard of care and <br /> practice in effect at the time Services were rendered. It should be recognized that <br /> ' definition and evaluation of environmental conditions is an inexact science and that the state <br /> or practice of environmental geology/hydrology is changing and evolving and that <br /> standards existing at the present time may change as knowledge increases and the state of <br /> the practice continues to improve. Further, that differing subsurface soil characteristics <br /> can be experienced within a small distance and therefore cannot be known in an absolute <br /> sense. All conclusions and recommendations are based on the available data and <br /> information. <br /> ' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law. No warranty, expressed or implied, <br /> is made. <br /> 1 <br />