My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013104
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
3780
>
3500 - Local Oversight Program
>
PR0545387
>
ARCHIVED REPORTS_XR0013104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 9:10:17 AM
Creation date
3/5/2020 8:30:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013104
RECORD_ID
PR0545387
PE
3528
FACILITY_ID
FA0005718
FACILITY_NAME
SINCLAIR TRUCKING
STREET_NUMBER
3780
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
3780 W LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lds <br /> Geological Tuhxics Inc Page 3 <br /> Sinclair&Thompson Property <br /> Soil Gas Survey Report <br /> LO January 29,2007 <br /> hydrocarbons at the site. A limited over excavation to a depth of 18-feet bgs was conducted <br /> in the general area of the UST and was backfilled with native soil. <br /> v On June 14, 1995, Geological Technics Inc. (GTI) installed three monitoring wells and <br /> advanced one soil boring in order to evaluate the vertical and lateral extent of gasoline range <br /> petroleum hydrocarbons. <br /> On February 16, 1999, GTI personnel supervised the installation of one groundwater <br /> monitoring well down gradient of the former UST to further define the lateral extent of <br /> gasoline contamination in the soil and groundwater. This well showed low levels of gasoline <br /> range hydrocarbons. <br /> In response to a request by Mr. Ron Rowe of SJCEHD, GTI prepared a work plan on January <br /> 18, 2000, to define the lateral extent of the soil and groundwater contamination at the site. <br /> ' On April 20, 2000, Ms Lori Duncan, SJCEHD, issued a letter denying the approval of the <br /> L, work plan. During phone conversations in May of 2000, Ms Duncan requested that a work <br /> plan be prepared for the installation of a deeper monitoring well near the source to define the <br /> vertical extent of the contamination and the installation of a sentinel well between the source <br /> and the domestic well. <br /> GTI submitted a new work plan on June 9, 2000, proposing the installation of a single deep <br /> L. monitoring well. Ms Duncan approved the work plan on June 28, 2000. A delay in the work <br /> plan implementation occurred due to a change in the Responsible Party and cost pre-approval <br /> ` for the work was obtained on October 28, 2001. <br /> L <br /> In April of 2002, GTI and V&W Drilling, Inc. (V&W) installed one deep monitoring well to <br /> ` 35 feet below grade (MW-101). On June 18, 2002, GTI prepared and submitted the Site <br /> �,. Characterization, Monitoring Well Installation and Groundwater Monitoring Report <br /> documenting the work performed during April of 2002. The report recommended continued <br /> ' groundwater monitoring as well as testing for biodegradation indicators. In a letter dated July <br /> L. 22, 2002, Ms Duncan approved the recommendations. <br /> ' On September 30, 2002, GTI prepared and submitted the 3rd Quarter 2002 Groundwater <br /> Monitoring Report recommending the site be considered for closure. In a letter dated March <br /> 3, 2003, Ms Duncan denied the request. A meeting was scheduled between Mr. and Mrs. <br /> Sinclair, Ms Duncan and Eric Price of GTI for March 27, 2003 to discuss the direction of the <br /> La project and remediation alternatives. <br /> On March 3, 2003, Lori Duncan directed ST to develop a site conceptual model. In addition <br /> 4- to the site conceptual model, Ms Duncan requested investigation of a potential NNW/SSE <br /> trending sand channel. GTI prepared and submitted the Initial Site Conceptual Model on <br /> June 18, 2003. <br /> Lo <br /> L. <br /> L. <br />
The URL can be used to link to this page
Your browser does not support the video tag.