My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7505
>
3500 - Local Oversight Program
>
PR0545388
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 10:42:17 AM
Creation date
3/5/2020 8:38:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545388
PE
3528
FACILITY_ID
FA0003212
FACILITY_NAME
JIMMY'S GROCERY & DELI
STREET_NUMBER
7505
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
24808013
CURRENT_STATUS
02
SITE_LOCATION
7505 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 April 1999 <br /> AGE-NC Project No. 95-0100 <br /> Page 3 of 7 <br /> • Permitting and pre-field work activities; <br /> Soil sample collection and analysis; <br /> • Ground water sample collection and analysis; <br /> Monitoring well installation and sampling; and <br /> • Report preparation. <br /> 3.1. -PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable site assessment permits will be obtained from the PHS-EHD. As required by PHS-EHD <br /> permitting, a health and safety plan will be prepared in accordance with Occupational Safety and <br /> Health Guidance Manual for-Hazardous Waste Site Activities (National Institute for Occupational <br /> Safety and Health Administration, U.S. Coast Guard and U.S.: Environmental Protection Agency, <br /> 1985). Prior to mobilization, each soil probe location will be clearly marked and an utility clearance <br /> obtained through Underground Service Alert. <br /> 3.2. MONITORING WELL INSTALLATION AND SAMPLING <br /> As a result of the groundwater sampling.for thecorrective action, an MTBE.impact to ground water <br /> was detected. Therefore, four ground water monitoring wells will be installed at the site. Proposed <br /> locations for monitoring wells are presented in Figure 2. The first soil boring will be advanced in <br /> the vicinity of the former dispenser. The other soil borings will be established in the apparent down <br /> gradient and cross gradient directions from the MTBE impact. <br /> The proposed monitoring wells will provide repeatable sampling points for the monitoring of <br /> impacts to ground water and allow determination of site-specific ground water flow direction. The <br /> procedures for monitoring well installation and collection-of soil and ground water samples are <br /> presented in Section 4.1. and Section 4.5., respectively. <br /> All borings are proposed to be advanced to approximately 55 feet bsg. Due to the limits of the soil <br /> contamination in the area of the former dispenser area, soil samples will be collected from each <br /> boring at five-foot intervals from a depth of 40 feet bsg to 55 feet bsg..Monitoring well installation <br /> activities are described below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.