Laserfiche WebLink
25 September 1995 <br /> AGE-NC Project No. 95-0100 <br /> Page 4 of 4 <br /> and implementation of a SVE system that can meet the remediation objectives. . <br /> Remediation well VW-1 will be used as the primary extraction well. Well VW-2 will.be used as an <br /> observation. <br /> Four vapor samples will be collected from the extraction well (VW-I) during the test. Samples will <br /> be collected at approximately 2-hour intervals. The samples will then'be transported under chain-of- <br /> custody to a state-certified laboratory for analysis.Each vapor sample will be analyzed for TPH-g and <br /> BTE&X in accordance with the appropriate EPA methods. <br /> 4.3. REPORT PREPARATION <br /> Upon completion of the pilot test a Corrective Action Plan,will be`prepared summarizing results of <br /> the feasibility testing and will include recommendations for remediation of impacted soil at the site. <br /> The report will be reviewed and signed by a California Registered Geologist. <br />