Laserfiche WebLink
SVS-14-6 is located on APN 149-085-14 and is just north of Condor's boring B-13. <br /> ' Boring B-13 encountered fat clay from 0-3 feet bgs, sandy silt from 3-9 feet bgs and lean <br /> clay from 9-15 feet bgs. <br /> ' AO /OC <br /> All QA/QC samples will be labeled as to be unidentifiable to the lab. Method blanks will <br /> ' be collected in the same manner as described above each day of sampling. Trip blanks <br /> will be used each day collected each day of sampling. Summa canisters will be filled <br /> with laboratory grade ultra pure air and analyzed by the laboratory for contaminates. At <br /> ' least one duplicate sample will be collected per day in separate sample containers at the <br /> same location and depth as the parent sample. <br /> 6.2.3 Organic Sampling <br /> Obtaining organic samples will be accomplished on a parcel by parcel basis. Each parcel <br /> is unique in its historical and current uses, structures and contents necessitating individual <br /> sampling plans for each parcel. The proposed sample points and analysis performed for <br /> each parcel are detailed in Appendix A,Figures 9—28: APN Organic Sampling Plan. <br /> Lead Based Paint (LBP) <br /> Sampling of elevated levels of lead will be conducted with guidance from the DTSC's <br /> Interim Guidance for Evaluating Lead Based Paint and Asbestos-Containing Materials at <br /> ' Proposed School Sites(July 23,2001) on all parcels. The soil surrounding the exterior of <br /> each existing and former structure will be analyzed for lead. Four (4) samples will be <br /> collected from the soil at the drip line—one from each side of the building—at 0-6 inches <br /> ' bgs (surface). (See Appendix A,Figures 9-28.) If the surface samples are found to <br /> contain lead levels above 255mg/kg,a 2 foot bgs sample will be collected and analyzed <br /> by the lab. Additionally,three 10 foot step out samples will be collected from the <br /> original sample point—two samples will be taken parallel and one perpendicular to the <br /> building wall. All of these samples will be analyzed for lead using EPA Method 6010B. <br /> APN 149-085-17 was the former location of a quadraplex residence. The footprint of this <br /> former structure has been estimated from historic maps and will be sampled at 6 separate <br /> ' points as outlined above. <br /> All of the lead lab analysis data will be entered into the DTSC Lead Spread model <br /> (Version 7 or later) and reported in the PEA Report. <br /> Asbestos <br /> ' Because many of the structures on the Site were built prior to 1976 they may have been <br /> built with Asbestos Containing Materials (ACM). All samples will be handled in <br /> concordance with SUSD's ACM policy. Samples for ACM's will be collected from the <br /> footprints of formerly heated buildings that have been demolished. These samples will <br /> be collected at the same living space sample points and depths as the LBP samples <br /> PEA Workplan 20 <br /> Spanos Elementary School <br /> January 18,2006 <br />