Laserfiche WebLink
' CONDOR EARTH PROM SElmenmryScbool PROJECT NO.: 3639D <br /> TECHNOLOGIES,INC. CLIENT: Stockton Unified School District <br /> 1 209-234-0518 PROJECT LOCATION: Comer of Califomia SL and Church St. <br /> cownori ELEVATION: 15 ft.Topo(assumed) <br /> FAX 209_234-0538 LOCATION: Build B-Southeast Comer <br /> DRILLER: RAM Geotechnical LOGGED BY: B.Cook <br /> LOG OF BORING DRILUNGMETHOD: 4"Solid Stem Auger(SSA) DATE: 11/18/05 <br /> No. B-12 DEPTH TO-WATER>INITIAL: s N/A AFTER DRILLING: < NIA CAVING> L N/A <br /> O <br /> �i C J d N V N 9 A N T <br /> L m N Description N 10 Z (D O Z O O 41 N C t J V f- <br /> ' m m E T p — <br /> O mF- U' rn U gU d de <br /> N <br /> D <br /> ' CL 0'_3 SANDY LEAN CLAY,dark brown,stiff to hard, 6 14 <br /> 6 <br /> slightly moist 2 s <br /> 3 <br /> 24 +50 15.3 100.3 <br /> sola <br /> ' S <br /> s <br /> " <br /> SM T-V SILTY SAND,yellowish brown,very dense, iz +So <br /> 4 24 <br /> r� 24 <br /> slightly moist 32 <br /> E <br /> s <br /> i <br /> ro CL 9'-1 T LEAN CLAY WITH SILT,dark brown,hard, <br /> S Slightly moist 2a +50 24.8 93.9 <br /> c <br /> 12 <br /> e <br /> a <br /> ' o <br /> t <br /> h ss <br /> ' a z 31 <br /> 17 5 <br /> n 16 <br /> oBoring terminated at 17 ft. <br /> a <br /> w <br /> r 20 <br /> c <br /> 0 <br /> O <br /> ' C <br /> L'. <br /> n <br /> 0 <br /> 7m <br /> E 2s <br /> `o <br /> t <br /> ' r <br /> 30 <br /> 35 <br /> 1 <br /> ' Boring backfilled with soil cuttings on 11118105 <br /> tPAGE 1 of 1 <br />