My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2900 - Site Mitigation Program
>
PR0507835
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:26:04 PM
Creation date
3/5/2020 11:23:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0507835
PE
2950
FACILITY_ID
FA0007793
FACILITY_NAME
SUPER STOP MARKET
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
02
SITE_LOCATION
290 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Page 24 of 27 <br /> 1. The date, exact place,time, and methods of sampling or measurements, and sample <br /> preservation techniques or procedures. <br /> 2. Who performed the sampling or measurement. <br /> 3. The date(s) analyses were performed <br /> 4. Who perfonned the analyses. <br /> 5. The analytical techniques or methods used. <br /> 6. The results of such analyses. <br /> F. Falsifying Information <br /> Knowingly making any false statement on any report or other document required by this <br /> permit or knowingly rendering any monitoring device or method inaccurate, is a crime <br /> and may result in the imposition of criminal sanctions and/or civil penalties. <br /> PART 11. ADDITIONAL REPORTING REQUIREMENTS <br /> A. Planned Changes <br /> The permittee shall give notice to the City 90 days prior to any facility expansion, <br /> production increase, or process modifications,which results in new or substantially <br /> increased discharges or a change in the nature of the discharge. <br /> B. Anticipated Noncompliance <br /> The permittee shall give advance notice to the City of any planned changes in the <br /> permitted facility or activity that may result in noncompliance with permit requirements. <br /> C. Duty to Provide Information <br /> The pennittee shall furnish to the City,within 30 days any infonnation which the City <br /> may request to detennine whether cause exists for modifying,revoking and reissuing,or <br /> terminating this permit,or to detennine compliance with this permit. The permittee shall <br /> also, upon request, furnish to the City within 30 days copies of any records required to be <br /> kept by this pen-nit. <br /> D. Signatory Requirements <br /> All applications,reports, or infonnation submitted to the City must contain the following <br /> certification statement and be signed as required.in paragraph 1, 2, 3,or 4 below: <br /> "I certify under penalty of law that this document and all attaclunents were <br /> prepared under my direction or supervision in accordance with a system designed <br /> to assure that qualified personnel properly gather and evaluate the information <br /> submitted. Based on my inquiry of the person or persons who manage the system, <br /> or those persons directly responsible forgathering the information, the <br /> Permit No. 05-3 <br /> Cardoza Enterprises <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.