My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004564
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2900 - Site Mitigation Program
>
PR0507835
>
ARCHIVED REPORTS_XR0004564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:20:43 PM
Creation date
3/5/2020 11:27:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004564
RECORD_ID
PR0507835
PE
2950
FACILITY_ID
FA0007793
FACILITY_NAME
SUPER STOP MARKET
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
02
SITE_LOCATION
290 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• C?eologica C Technics /Ac. <br /> 2741 River Road -J.J <br /> Modesto,California 95351 <br /> (209)538-6424/Fax#538-5852 <br /> Work Plan Addendum <br /> Soil and Groundwater Investigation <br /> ' Super Stop Market <br /> Cardoza Enterprises <br /> 290 N. Main St. <br /> Manteca, CA <br /> Project No 662 2 <br /> November 30, 2001 <br /> Proposed BoringMell Location <br /> ' In accordance with October 26, 2001 directive from Sam Savig, a single boring (MW-104) <br /> will be advanced in the location of proposed well MW-4 The boring will be drilled in <br /> accordance with those procedures detailed in the "Soil & Groundwater Investigation Work <br /> Plan" prepared by Geological Technics Inc on October 8, 2001 A single deep screened <br /> monitoring well will be constructed in the boring following procedures as above <br /> Additional Boris ell Locations <br /> Upon the completion of the above work, an addendum will be prepared for submittal to SJC <br /> PHS/EHD proposing the location and construction of additional monitoring wells These <br /> ' borings/wells will be drilled and constructed in accordance with the procedures detailed in <br /> the "Soil & Groundwater Investigation Work Plan"prepared by Geological Technics Inc on <br /> October 8, 200I <br /> Signature and Certification <br /> Geological Technics Inc will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> ' This work plan was prepared by <br /> S�� <br /> JosephAngulo ES[Q <br /> Geologist Q�a <br /> h RI <br /> (7 <br /> Raynold I Kablanow 11, Ph D * I� <br /> California Registered Geologist#5234 <br /> Certified Hydrogeolog>st #442 �ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.