Laserfiche WebLink
GeolagualTecFrnres Inc Page 3 <br /> Soil and Groundwater Investigation Work Plan <br /> ' Cardoza(Main St) <br /> Project No 662 2 <br /> .Tune 17, 1998 � <br /> ' 3.0 SCHEDULE & REPORTING <br /> ' Geological Technics Inc anticipates beginning field work no later than 30 days after work <br /> plan approval and upon issuance of the drilling permit The information gathered during this <br /> phase of work will be presented in a report, which will include a summary of the geology as <br /> ' well as the results of sample analyses Dr Ray Kablanow, a registered professional <br /> geologist, will supervise the project Copies of the report will be forwarded to both the <br /> appropriate County and State regulatory agencies (SC PHS/EHD and CRWQCB) <br /> ' 4.0 SIGNATURE AND CERTIFICATION <br /> ' This project will be performed by Geological Technics Inc in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> ' This work plan was prepared by <br /> ' CGeofogxcafTechnws Inc <br /> ' Michael J Niemi <br /> Geologist <br /> EssEon� <br /> �q c� <br /> t KABW 40W 11 °ray <br /> c� C) <br /> NO <br /> Raynold I Kablano II, PhD * s23a <br /> ' California Registered Geologist 45234 �' <br /> Registered Environmental Assessor 4901 hof gift <br /> 1 <br /> 1 <br /> t <br /> 1 <br />