My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004583
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2900 - Site Mitigation Program
>
PR0507835
>
ARCHIVED REPORTS_XR0004583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:11:43 PM
Creation date
3/5/2020 11:43:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004583
RECORD_ID
PR0507835
PE
2950
FACILITY_ID
FA0007793
FACILITY_NAME
SUPER STOP MARKET
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
02
SITE_LOCATION
290 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q ! <br /> ! Geological recl�/tics Inc. <br /> I 101 7111 Street <br /> Modesto,Califomia 95354 <br /> (209)522-4119/Fax#522-4227 <br /> September 30, 2002 FCENEDDProject No 6622 mo <br /> Project Name Cardoza (Main St) <br /> OCT 0 9 2002 <br /> Mr Ed Cardoza <br /> Cardoza Enterprises NV1RaNMEN� H1=��TH <br /> PO Box 1022 PERMt�IS�RVICES <br /> Manteca, CA 95336 <br /> RE Addendum #3 To Soil & Groundwater Investigation Work Plan, October 8, 2001 <br /> Location Super Stop Market, 290 N Main St <br /> Dear Mr Cardoza <br /> Geological Technics Inc (GTI) is pleased to present the attached Addendum #3 to our <br /> above referenced work plan GTI originally proposed to install one shallow and five deep <br /> monitoring wells in our work plan In his October 26, 2001 correspondence Mr Sam Savig <br /> of SJC PHS/EHD directed that a single, continuously sampled boring be installed first with <br /> additional well locations to be suggested in a subsequent addendum The first bonng/well <br /> MW-104 was installed on May 30, 2002 In our July 2, 2002 "Work Plan Addendum #2" <br /> GTI proposed the locations of the additional wells In telephone conversations with GTI <br /> staff, Mr Mike Infurna of the SJC PHS/EHD (Mr Savig no longer works for the SJC <br /> PHS/EHD) requested an addendum that included a well up gradient of the former and <br /> existing UST tank locations <br /> This plan calls for <br /> * Advancing two water table monitoring wells to determine the lateral extent of the <br /> groundwater plume (MW-5 & 6) <br /> * Installing three deep monitoring wells to determine the lateral and vertical extent of the <br /> groundwater plume (MW-106, 107, 108) <br /> * The locations of the proposed wells are indicated on the attached site map The <br /> construction and development/sampling protocols will follow those in the anginal work <br /> plan and addenda <br /> * The site conceptual model will be clarified as indicated by the proposed well locations <br /> in Cross Section A—A' (attached) <br /> If you have any questions or need additional information, please contact me Thank you for <br /> this opportunity to serve your environmental needs <br /> Si erely, <br /> Rayn Id I -441 <br /> ian w 11, Ph D <br /> Vice President <br /> cc Mike Infurna - San Joaquin County PHS/EHD <br /> Marty Hartzell - CRWQCB-CVR <br />
The URL can be used to link to this page
Your browser does not support the video tag.