My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2200 - Hazardous Waste Program
>
PR0513627
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:23:37 PM
Creation date
3/5/2020 11:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513627
PE
2227
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Evacuation Procedures <br /> (1) In the event that the hazardous waste or materials incident threatens employees or other occupants of a DSS Company job <br /> site,the EC in command shall order an immediate evacuation. <br /> (2) The EC or designee will announce the evacuation via the public address/paging system or other communication system. <br /> (Describe): <br /> (3) Employees, upon hearing a order to evacuate, or who otherwise become aware of the need to evacuate, shall notify other <br /> employees, safely cease o rations and evacuate without delay via the nearest designated unobstructed exit. An evacuation <br /> plan (see Section 8 below)is posted in all work areas showing the nearest exit(s)and the location of the assembly area in <br /> front of the building. <br /> (4) Regardless of the exit used,all employees who evacuate shall assemble at <br /> The EC or designee shall be present in this location to account for all personnel known to be on the site. No employee shall <br /> leave the site without specific authorization by the senior supervisor, EC or designee. <br /> (5) Employees shall not re-enter the job site for any purpose until specifically authorized to by the EC or designee. <br /> 8. Evacuation Routes <br /> If evacuation is required,the following routes must be taken. If any evacuation route is blocked by the hazard,the secondary <br /> routes shall be taken: <br /> Location of Employee/Evacuee Evacuation Route Secondary Route <br /> J <br /> As required by CaUOSHA Standard, 8 CCR§3220,evacuation routes are diagramed and posted in various locations at the <br /> facility. <br /> 9. Approval and Adoption <br /> Contingency Plan Approved by: <br /> Title: <br /> Signature/Date: <br /> Effective Date: <br /> Note: This Contingency Plan will be reviewed annually and revised as necessary. Recipients will be provided a revised copy if <br /> significant changes are made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.