Laserfiche WebLink
1 <br /> C?Nlogka17--CW-s 14C Page 5 <br /> Groundwater Monitoring Report <br /> Project No 662 2 <br /> November 15,2004 <br /> 2004 facsimile correspondence The first phase of the work was completed oil October <br /> 26 - 27, 2004 with the installation of one extraction well and two monitoring wells The <br /> performance of a pilot test for dual phase extraction/aquifer pumping is scheduled for <br /> December 6— 10, 2004 <br /> ' • All of the site's wells, five existing and three new wells, will be surveyed in accordance <br /> with Geotracker requirements <br /> 3.0 LIMITATIONS <br /> ' This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered It should be recognized that definition <br /> and evaluation of environmental conditions is an inexact science and that the state or practice <br /> of environmental geology/hydrology is changing and evolving and that standards existing at <br /> the present time may change as knowledge increases and the state of the practice continues to <br /> improve Further, that differing subsurface soil characteristics can be experienced within a <br /> ' small distance and therefore cannot be known in an absolute sense All conclusions and <br /> recommendations are based on the available data and information. <br /> The tasks proposed and completed during this protect were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> 1 <br /> 4.0 SIGNATURES AND CERTIFICATION <br /> ' This report was prepared b <br /> P P P Y <br /> Joseph ngulo <br /> ' Geologist IR 0*E5$10 <br /> R1 KABlANO►W p Grp <br /> • ~� No 5234 <br /> ' California Registered Geologist #5234 �l9rFDf CA►tiFa���P <br /> t Certified Hydrogeologist #442 <br /> 1 <br />