Laserfiche WebLink
' Citolo&afredw&sr,rr- Page 5 <br /> Groundwater Moratonng Report <br /> Project No 662 2 <br /> August 30,2004 <br /> • In our April 19, 2004 work plan GTI proposed additional groundwater plume definition <br /> and an aquifer pumping test The SJC/EHD approved the work plan in their May 21, <br /> ' 2004 facsimile correspondence The work plan will be initiated pending receipt of <br /> encroachment permits from San Joaquin County and City of Manteca <br /> ' 3.0 LIMITATIONS <br /> ' This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered It should be recognized that definition <br /> and evaluation of environmental conditions is an inexact science and that the state or practice <br /> ' of environmental geology/hydrology is changing and evolving and that standards existing at <br /> the present time may change as knowledge increases and the state of the practice continues to <br /> ' improve Further, that differing subsurface soil characteristics can be experienced within a <br /> small distance and therefore cannot be known in an absolute sense All conclusions and <br /> recommendations are based on the available data and information. <br /> ' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> 4.0 SIGNATURES AND CERTIFICATION <br /> If you have any questions or if we can be of further assistance, please do not hesitate to <br /> ' contact our office at 209-522-4119 <br /> This report was prepared by <br /> JosepO Angulo <br /> Geologistp� ss+o, t <br /> ' R i "MANDOw a <br /> " s <br /> NO 5234 <br /> now 19, Ph D <br /> California Registered ed Geol g st #5234 -3t,9OP CALiFO��� <br /> Certified Hydrogeologist #442 <br />