My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004589
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2900 - Site Mitigation Program
>
PR0507835
>
ARCHIVED REPORTS_XR0004589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:23:37 PM
Creation date
3/5/2020 11:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004589
RECORD_ID
PR0507835
PE
2950
FACILITY_ID
FA0007793
FACILITY_NAME
SUPER STOP MARKET
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
02
SITE_LOCATION
290 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C,eologual rechh"s Inc Page 9 <br /> Feasibility Study&Investigation Work Plan <br /> Cardoza(Main St) <br /> Project No 662 2 <br /> April 19,2004 <br /> unknown if the aquifer test will reach steady state conditions However, a "Discussion of <br /> Applicable Equations" is included in Appendix B <br /> ' In the event that a cone of depression with a large radius develops during the aquifer test, <br /> the data will also be analyzed by distance-drawdown methods , To use distance-drawdown <br /> accurately, the cone of depression must reach at least three observation wells that are <br /> ' located at three different distances from the extraction well <br /> The data that will be collected after the aquifer test has concluded will be analyzed by the <br /> ' appropriate aquifer equations for the type of aquifer determined to characterize this interval <br /> The test results and calculations will be presented in a report that will subsequently be used <br /> to prepare an interim remedial design plan (if necessary) This plan will propose the <br /> extraction system for the capture zone and the source extraction area <br /> ' 5.3 Mass Balance Calculations <br /> In our February 9, 2004 "Additional Site Characterization - Soil and Groundwater <br /> ' Investigation" report GTI presented estimates of the quantities of TPH-G and MTBE in soil <br /> and groundwater at the site GTI will attempt to quantify the amount of residual <br /> contamination by determining the amount of contaminants removed during the proposed <br /> ' test and subtracting from the original estimates <br /> 6.0 SCHEDULES & REPORTING <br /> Upon work plan approval, we will immediately proceed with budgeting/scheduling this <br /> project The infonnation gathered during this phase of work will be presented in a report, <br /> ' which will include a summary of the extraction data and recommendations Dr Ray <br /> Kablanow, a registered professional geologist, will supervise the project Copies of the <br /> report will be forwarded to the appropriate County and State regulatory agencies (SJC <br /> PHS/EHD and CRWQCB) <br /> Our proposed schedule for performing the work proposed above is <br /> ' Feasibility Study <br /> ❑ Submit dual phase work plan April 2004 <br /> ' ❑ Receive work plan approval from SJC/EHD June 2004 <br /> a Finalize Budget August 2004 <br /> o Install Monitoring and Extraction Wells September 2004 <br /> ra Perform dual phase pilot test October 2004 <br /> ❑ Submit the dual phase test report December 2005 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.