Laserfiche WebLink
' geologual Tec"Cs Inc Page 5 <br /> Groundwater Monitoring Report <br /> Project No 662 2 <br /> April 12,2004 <br /> ' + We are preparing a "Feasibility Study & Additional Site Characterization"work plan for <br /> additional monitoring wells and a dual phase extraction pilot test Extraction well EW-1 <br /> ' was installed on December 12, 2003 that will be used for this feasibility test The dual <br /> phase extraction will be implemented pending approval from the SJC/EHS <br /> ' 3.0 LIMITATIONS <br /> ' This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered It should be recognized that definition <br /> and evaluation of environmental conditions is an inexact science and that the state or <br /> ' practice of environmental geology/hydrology is changing and evolving and that standards <br /> existing at the present time may change as knowledge increases and the state of the practice <br /> continues to improve Further, that differing subsurface soil characteristics can be <br /> ' experienced within a small distance and therefore cannot be known in an absolute sense <br /> All conclusions and recommendations are based on the available data and information <br /> ' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> ' 40 SIGNATURES AND CERTIFICATION <br /> If you have any questions or if we can be of further assistance, please do not hesitate to <br /> contact our office at 209-522-4119 <br /> This report was prepared by <br /> ' Jose6lb Angulo <br /> Geologist <br /> ' Ess100 <br /> � <br /> h ( �u+t�W 0 Or� <br /> 1O 5234 <br /> Raynold I Kablanow II, Ph D <br /> ' GeologistCalifornia Registered #5234 <br /> Certified Hydrrogeolog t #442OF CAIiF�Q�\P <br /> 1 <br />