Laserfiche WebLink
TABLE OF CONTENTS <br /> EXECUTIVE SUMMARY <br /> 1.0 SITE HISTORY <br /> 2.0 SOIL & GROUNDWATER INVESTIGATION <br /> 2.1 Monitoring Well MW-104 Installation (May 30, 2002) <br /> 2 1.1 Monitoring Well Installation <br /> ' 2 12 Sod Sampling Procedure <br /> 2.1.3 Soil Laboratory Analyses <br /> 2.2 Cone Penetrometer Testing (CPT) <br /> ' 2.3 Soil Sampling Procedure <br /> 2.4 Soil Laboratory Analyses <br /> 2.5 Groundwater Sampling Procedure <br /> 2.6 Groundwater Laboratory Analyses <br /> 3.0 GROUNDWATER EXTRACTION WELL <br /> 3.1 Extraction Well Installation <br /> ' 3.2 Soil Sampling Procedure <br /> 3.3 Geotechnical Analyses <br /> 34 Well Development <br /> 4.0 DISCUSSION <br /> 4.1 Geology and Hydrogeology of the site <br /> ' 4.2 Chemical Distribution <br /> 4.3 Contaminant Mass Estimate Calculations <br /> ' 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> 5.1 Conclusions <br /> 5.2 Recommendations <br /> 60 LIMITATIONS <br /> 7.0 SIGNATURES AND CERTIFICATION <br /> 1 <br />