Laserfiche WebLink
Page 4 of 27 <br /> • sampling shall be reported in the month following analysis and shall be included <br /> in the self-monitoring report, or if no self monitoring report is due in the <br /> following month the analysis shall be reported to the City by the 20`h of the <br /> month Increased monitoring results shall be identified when included in a <br /> required self-monitoring report <br /> C Automatic Resampling <br /> If the results of the permrttee's wastewater analysis indicates that violation of this <br /> permit has occurred, the permittee must <br /> 1 Inform the City of the violation within 24 hours, and <br /> 2 Repeat the sampling and pollutant analysis and submit, in writing, the <br /> results of this second analysis within 30 days after the first violation <br /> became known <br /> D Accidental Discharge Report <br /> 1 The permittee shall notify the City immediately upon occurrence of an <br /> accidental discharge of substances prohibited by the Waste Discharge <br /> Ordinance or any slug loads or spills that may enter the public sewer The <br /> notification shall be given to the Water Quality Control Facility at 209- <br /> 239-8433 The notification shall included <br /> a The facility name and location of the discharge <br /> b The date, and time of the discharge <br /> c The type of waste, including the concentration and volume <br /> d The corrective actions taken <br /> 2 Within five days following an accidental discharge, the permittee shall <br /> submit to the City a detailed written report The report shall specify <br /> a Description and cause of the upset, slug load, or accidental <br /> discharge, the cause thereof, and impact on the permittee's <br /> compliance status The description should also include location <br /> of discharge, and the type, concentration and volume of waste <br /> b Duration of noncompliance, including exact dates and times of <br /> noncompliance and, if the noncompliance is continuing, the date <br /> and time by which compliance is reasonably expected to occur <br /> c All steps taken or to be taken to reduce, eliminate, and/or prevent <br /> recurrence of such upset, slug load, accidental discharge, or other <br /> condition of noncompliance <br /> E All reports required by this permit shall be submitted to the City at the following <br /> address <br /> • <br /> Permit No 05-3 <br /> Cardoza Enterprises <br />