4?0& fcal Techn ks litc Page 7 <br /> ' Groundwater Monitoring Report <br /> Project No 662 2 <br /> July 7,2005 <br /> 1 <br /> and will be implemented pending budget, permitting and procurement processes that are <br /> ' currently underway <br /> 3 A full scale Corrective Action Pian (CAP) should be deferred until after off site wells <br /> MW-5 and MW-6 have been monitored for several quarters to determine contaminant <br /> ' trends and after the interim remedial action has been in operation for a year to determine <br /> it's effectiveness at mitigating this plume Once these tasks have been accomplished a <br /> full scale CAP can be developed if needed, an accordance with County mandates and <br /> ' USTCFP requirements for three remedial alternatives <br /> 4.0 LIMITATIONS <br /> 1 <br /> This report was prepared an accordance with the generally accepted standard of care and <br /> ' practice in effect at the time Services were rendered It should be recognized that definition <br /> and evaluation of environmental conditions is an inexact science and that the state or practice <br /> of environmental geology/hydrology is changing and evolving and that standards existing at <br /> the present time may change as knowledge increases and the state of the practice continues to <br /> improve Further, that differing subsurface soil characteristics can be experienced within a <br /> small distance and therefore cannot be known in an absolute sense All conclusions and <br /> recommendations are based on the available data and information. <br /> ' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> 1 <br /> 1 <br /> 1 <br />