My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
224
>
3500 - Local Oversight Program
>
PR0545393
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 1:56:50 PM
Creation date
3/5/2020 1:22:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545393
PE
3528
FACILITY_ID
FA0005072
FACILITY_NAME
DIAMOND LUMBER INC
STREET_NUMBER
224
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04308301
CURRENT_STATUS
02
SITE_LOCATION
224 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following presents Park's proposal to address the above agency concerns. <br /> SCOPE OF WORK <br /> • Drill one 35-foot soil boring <br /> I, <br /> Collect soil samples at 15, 20, 25, 30, 35 bgs. <br /> ii <br /> • Analyze samples for TPHg (8015), BTEX(8020), and Total Lead (7420), <br /> i� <br /> • Backfill boring with Portland Cement <br /> • Reporting <br /> JI <br /> Two Quarters',Groundwater Sampling i <br /> ,I <br /> • Purge 3 groundwater wells monitor temp, pH, cond. <br /> • Drum waters on-site* <br /> • Collect groundwater samples, filter"water <br /> • Analyze groundwater for TPHg, BTEX, Total Lead <br /> • Reporting <br /> * The'disposal of soil boring cuttings and purge waters are the responsibility-.of Diamond <br /> Lumber Company. Park will assist in selecting the.appropriate and most!cost effective <br /> disposition. <br /> Park can begin work within two weeks after receiving approval to proceed by Diamond Lumber <br /> Company or their agent. We look forward to working with.you-on this project. <br /> Please address'any questions to our Rocklin office at(916) 652-3861. <br /> Sincerely, <br /> Park Environmental Corporation <br /> i <br /> Richard . Zipp, R.G., C.E.G. <br /> Principal Hydrogeologist > <br /> k <br /> k <br /> f <br /> 501641 2 <br /> i. I <br /> . l <br /> II <br /> 3f r k <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.