My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
224
>
3500 - Local Oversight Program
>
PR0545393
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 1:56:50 PM
Creation date
3/5/2020 1:22:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545393
PE
3528
FACILITY_ID
FA0005072
FACILITY_NAME
DIAMOND LUMBER INC
STREET_NUMBER
224
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04308301
CURRENT_STATUS
02
SITE_LOCATION
224 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
collecting water samples. Purge water will be stored in 55 gallon drums until receipt of <br /> analytical test"results to evaluate appropriate disposition of the waters. Disposal of the waters are <br /> the responsibility of Diamond Lumber. <br /> ♦ Collect three sets of groundwater samples. <br /> Three identical sets of samples will be collected from each monitoring well. Samples will be <br /> placed into sariple containers provided by the analytical laboratory. Anlab will provide a M <br /> laboratory technician to collect the groundwater samples and to field filter the one sample prior <br /> to acidification.. <br /> ♦ Analyze each sample set, including filter paper, for total lead. <br /> E� <br /> Analyze each set using EPA Method 7421; <br /> f <br /> ♦ Document findings. <br /> Prepare a brief report presenting a description of the work performed, the test results, and Park's .; <br /> interpretation of the results. Copies of all chain of custody documents and laboratory=reports will <br /> be attached to the report. <br /> We are prepared to perform the above sampling within one week after receiving approval to E <br /> proceed by your office and access to the site. Assuming noinial'laboratory turn around time F <br /> results should be available for your review within 30 days after sample collection.' <br /> Please contact Park's Rocklin office at{916} 652-3861 if you have any comments on the above <br /> document. <br /> Sincerely, <br /> Park Environmental Corporation F <br /> 1 <br /> Richard J. Zipp, R.G., C.E.G: <br /> Principal Hydrogeologist ` <br /> 5016JI 4 �; <br />
The URL can be used to link to this page
Your browser does not support the video tag.