Laserfiche WebLink
CITY OF LODI ENCROACHMENT PERMIT <br /> GENERAL PROVISIONS <br /> 1. REVOCATION: This permit issued by the City of Lodi shall be revocable upon any violation of the provisions as <br /> hereinafter provided. <br /> 2. ACCEPTANCE OF PROVISIONS: It is understood and agreed by the Permittee that the doing of any work under this per. ' <br /> mit shall constitute an acceptance of the General Provisions. <br /> 3. KEEP PERMIT ON THE JOBSITE: This permit, or copy thereof, shall be kept on the jobsite and must be shown to any <br /> representative of the Public Works Department, or any law enforcemerr officer of the City of Lodi, on demand. <br /> 4. PERMITS FROM OTHER AGENCIES:The party or parties to whom this`nermit is issued shall,whenever the same is re- <br /> quired by law, secure the written order and consent to do any work unce- an Encroachment Permit from CALTRANS.All <br /> work performed within paved areas, traveled ways or improved shoulde _ of said State Highways shall conform to the <br /> current standard specifications of CALTRANS. Any permit shall not be �,alid until such order and consent is obtained. <br /> 5. NOTIFICATION TO OTHER AGENCIES:No excavation shall be done until all utility agencies have been notified and have <br /> been given the opportunity to mark their facilities in the field. Notification shall be given to USA at (800) 642-2444, 48 <br /> hours prior to starting work. <br /> 6. MINIMUM INTERFERENCE WITH AND PROTECTION OF TRAFFIC: All work shall be planned and carried out so that <br /> there shall be the least possible inconvenience to the traveling public. Permittee is authorized to place flaggers to stop <br /> and warn or direct traffic, but traffic shall not be unreasonably delayed. One-way traffic shall be maintained at all times. <br /> Adequate provisions shall be made for the protection of the traveling public. Placing of lights,barricades,warning signs <br /> and other safety devices and other measures required for the public safety shall be the responsibility of Permittee. <br /> 7. -STORAGE OF MATERIALS: No material shall be stored on any public street, alley, or sidewalk unless approved by the <br /> Public Works Director. Any,excess earth materials from trenching or other operations shall be removed from the pave- <br /> ment, traveled way, or shoulders as the trench is backfilled or other work carried forward. <br /> 8. STANDARDS OF CONSTRUCTION: All work shall conform to City of Lodi Construction Specifications and Standard <br /> Plans. <br /> 9. CARE OF DRAINAGE:If the work herein contemplated interferes with the established drainage,provisions shalt be made <br /> by Permittee to provide adequate drainage as may be directed by the Public Works Director or his representative. <br /> 10. REPAIRS: In every case Permittee shall be responsible for restoring to its former condition as nearly as may be possible <br /> any portion of the street, sidewalk area or other encroachment which has been excavated or otherwise disturbed by Per- <br /> mittee. Permittee shall be responsible for said work for a period of one year after completion and acceptance of the work <br /> by the Public Works Director or his representative. <br /> 11. MAINTENANCE: Permittee agrees,-by acceptance of a permit, to exercise reasonable care to maintain properly any en- <br /> croachment placed in the street or sidewalk area and to exercise reasonable care in inspecting for and preventing any in. <br /> jury to any portion of the street or sidewalk area resulting from the encroachment. <br /> 12. CLEANUP OF JOBSITE: Upon completion of work the jobsite shall be restored to a condition of order and cleanliness. <br /> 13. INSPECTION: A minimum of twenty-four (24) hours' notice shall be required for inspection prior to the placing of any <br /> backfill, connection to any existing facility, or the placement of any concrete or paving work. <br /> 14. APPROVAL: All work shall be subject to approval by the Public Works Director or his representative. <br /> 15. DUST CONTROL: Dirt, dust, and mud to be controlled by Permittee or City has the right to do the work and bill Owner. <br /> SPECIAL PROVISIONS <br /> 1. TRENCHING, BACKFILL AND RESURFACING: All trenching and backfill shall conform to City of Lodi Standard Plans <br /> and Specifications. Resurfacing of streets shall be as required by the Public Works Director.Streets shall be resurfaced <br /> in kind or with 3-inch asphaltic concrete, whichever is greater.Upon request by the City, any settlement,sagging of sur- <br /> face, or cracking of pavement shall be repaired immediately by and at the sole expense of the Permittee for a period of <br /> one year following the acceptance by the City. <br /> 2. PORTLAND CEMENT CURBS,GUTTERS,SIDEWALKS AND DRIVEWAYS:Existing concrete work shall be removed to the <br /> nearest score mark or construction joint.Sidewalk and/or curb and gutter shall be cut cleanly and removed for the entire , <br /> width. All concrete curb, gutter, sidewalk, and/or driveways shall be replaced or constructed to conform to City of Lodi <br /> Standard Plans.All concrete work shall be scored and made to conform to adjacent existing concrete work unless other- <br /> wise directed by the Public Works Director. <br /> 3. LATERAL STREET CUTS:A street cut of 30"by 30" may be made for connection to any main line. Connecting pipe may <br /> be required to be jacked completely under the street paving, curb and/or gutter and sidewalk. If a sidewalk cut is <br /> necessary, the sidewalk shall be replaced in conformance with Section 2 above. The street cut shall be backfilled and <br /> repaved in conformance with Section 1 above. <br /> 4. LANDSCAPED AREA INSTALLATIONS: Where utilities are to be placed in the parking strip adjacent to the curb and/or <br /> sidewalk, Permittee shall take all necessary precautions to protect the existing curb and/or sidewalk and landscaping , <br /> and shall replace same at its sole expense if damaged. No excavated material or other obstructions shall be placed on <br /> the curb and/or sidewalk location or in the gutter. <br /> 5. TIME ELAPSED PRIOR TO TEMPORARY AND PERMANENT REPAVING:Temporary or permanent surfacing shall be in- <br /> stalled on the same or next working day after the backfilling has been completed or when directed by the Public Works <br /> Director. <br /> 6. FRIDAY WORK: No work shalt be started on any Friday of any week if the work to be done under said permit is of such <br /> nature as to cause pedestrian or vehicular traffic interruption over the weekend if not completed. <br />