Laserfiche WebLink
Ms. Mary Meays <br /> Quarterly Summary Report <br /> December 1, 1992 <br /> Page 3 <br /> (sample I.D.'s S-1, S-2, and S-3). The samples were submitted to GTEL, composited into one <br /> sample (sample I.D. S-1,2,3) and then analyzed for TPHg and BTEX. Laboratory analysis of the <br /> composite sample revealed no detectable concentrations of TPHg or BTEX. Copies of the <br /> laboratory reports for both soil samples are attached. <br /> On the basis of the analytical results described above, SEACOR requests permission to dispose the <br /> soil cuttings by spreading the soil onto the ground in the vicinity of the treatment compound. <br /> Work Plan Preparation <br /> Based on discussions during our November 10, 1992 meeting at your office, SEACOR has been <br /> authorized to prepare a Work Plan for installing two additional groundwater monitoring wells at the <br /> site. The purpose of these monitoring wells is to confirm the direction of groundwater flow and <br /> evaluate groundwater quality downgradient of the former UST. The Work Plan will also include a <br /> description of approach and methodology for the confirmatory soil boring to be drilled in the source <br /> area. To minimize mobilization costs to our client, SEACOR proposes to install the additional <br /> monitoring wells and confirmatory soil boring at the same time. <br /> Please feel free to contact me at (415) 882-1548 if you have any questions or comments regarding <br /> this letter. <br /> Sincerely yours, <br /> Science & Engineering Analysis Corporation <br /> Bruce E. Scarbrough, R.G. #4931 <br /> Principal Geologist <br /> NOV.QSR <br /> 50014-001-05 MKOI <br />