My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
777
>
3500 - Local Oversight Program
>
PR0545417
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:18:02 PM
Creation date
3/5/2020 4:11:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545417
PE
3528
FACILITY_ID
FA0010249
FACILITY_NAME
BERNARD A WEVER TRUCKING
STREET_NUMBER
777
Direction
S
STREET_NAME
LOCUST
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25935002
CURRENT_STATUS
02
SITE_LOCATION
777 S LOCUST AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 May 1999 <br /> AGE-NC Project No. 99-0608 <br /> Page 3 of 7 <br /> LOCATION:i JOB FUNCTION LEVELS OF PROTECTION <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator (if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Tony Mikacich Collect soil samples; direct probing <br /> FIELD CREW: TASK: <br /> Geo Probe Operator Advance borings <br /> Field Technician (if nec.) Clean equipment <br /> The work party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.