My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:33:06 PM
Creation date
3/5/2020 4:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Harlin Knoll Project No. 2007-065-01 <br /> April 28, 2000 <br /> Page 2 j <br /> Stratus will also install one air sparge well in the vicinity of the underground storage <br /> tanks (USTs) as recommended in the RAP. The air sparge well will be connected to a <br /> proposed soil vapor extraction and air sparge (SVEAS) system. <br /> Scope of Work <br /> Status has prepared the following scope of work to accomplish the objectives described <br /> above. The scope of work has been subdivided into tasks 1 through 5 ,which provides <br /> details for activities associatedr with that particular task. All geologic work will be <br /> under the direct supervision of a State of California Registered Geologist and will be <br /> conducted in accordance with standards established by the Tri-Regional Board <br /> Guidelines for Hydrocarbon Site Assessment and Remediation (RWQCB 1991). <br /> Task 1 Prefield Activities <br /> Following approval of the workplan by SJCPHS, Stratus will initiate the following <br /> activities: <br /> • Obtain the necessary drilling permits from the SJCPHS, <br /> • Obtain City encroachmentpermit to abandon MW-5. <br /> • Prepare a site specific health and safety plan, <br /> • Contact Underground Service Alert to locate underground utilities at and adjacent f <br /> to the site, <br /> • Retain and schedule a drilling contractor to advance soil borings and install wells. <br /> Task 2 Install Monitoring Wells and Air Sparge Well <br /> To assess the extent of petroleum hydrocarbons in groundwater, activities outlined below <br /> will be conducted. Appendices;A, Exploratory Boring and Well Installation Procedures <br /> and Appendix B, Sampling and Analysis Procedures present detailed procedures <br /> associated with the proposed activities. <br /> Task 2A - Exploratory Borings <br /> A licensed well driller will advance exploratory borings using 10-inch-diameter hollow- <br /> stern augers at the proposed locations. Two borings will be advanced to approximately 45- <br /> feet bgs and will be converted toy groundwater monitoring wells. A third boring, using 10- <br /> inch-diameter hollow-stem augers, will be advanced to a depth of 45-feet bgs and will be ; <br /> converted to an air sparge well. <br /> CA65wrkp1n,doc Stratus E <br />
The URL can be used to link to this page
Your browser does not support the video tag.