Laserfiche WebLink
Cl7-.�✓J rHKK 1--14V1NU41'1=NJHL LUKH. P.04 <br /> r <br /> REMEDUL CTX r i PLAN ADDENDUM#11 <br /> [TSA PETRD ESTATION 4 65 <br /> FEBRUARY7 946 I <br /> A list of tasks r equirca to implemeig his RAA and the associated costs for each task are <br /> sumn=i.zed in the following section. <br /> Systern Desi I $2,300.00 <br /> Permitting $ 1,450.04 <br /> 'lent g ane Repaving t ` $3,754.011 <br /> Consm ction anageamnt I $2,100.00 <br /> s $4,150.00 <br /> SVE S stem Mental(2 mor ths) $6,000.00 <br /> r • <br /> Systern Startup I $ 1,880.00 <br /> , <br /> 5 ste Main* ance ; $ 1,350.00 <br /> The estimated cost for this RAA is a�proxirnately$23,000.00. Please note that this cost is in ' <br /> addition to the quartcl�ly groundw .oex monitoring costs at the site. <br /> € I <br /> OPTION,IMH Ettca I tion'V b�# Site DispmVr reatment <br /> Basode viouk investigations it is estimated that the hydrocarbon impacted soil extends to <br /> a depth of up 5�l- et bgs.' Du tri the location of the hydrocarbon impacted soil zone, <br /> excavation ac vides r ould requ' removal of the USTs,product piping and aboveground <br /> structures, majo physical obbtr�l coons associated with this option.combined with the <br /> excessive'cost md Joss of daily retaYllopempons makes this RAA econon*afly unattractive. <br /> The cost of' lerrWz'dog this Is summariwd below: <br /> i k <br /> Demob tion of Service Sta r 21,000.04 <br /> Ftemov al of sphalt*ad C0 n' Surface $ 2,500.00 <br /> Excava tion of hq*cied S i(Assurrc 40'X 40'X 50) $ 65,000.00 <br /> "Port pill and Gompacti 'testing $ 124,000.00 <br /> Resurfi tce Area with 4-in Nsphalt ; $ 18,000M ' <br /> 3 <br /> i <br /> n <br />