Laserfiche WebLink
SVE-3'-310 MANIFOLD VENT TO <br /> 2"-V-100 ATMOSPHERE <br /> (EXHAUST STACK) <br /> 3-4 <br /> i} SP-fNFL TULER MOUNTED CATALYTK: UNIT SP-EFF <br /> AJ (PRaV10EA WY STRATUS M <br /> o N I— ANCHORED BY CONTRACTOR) COPPER COIL <br /> r - 3" HOSE WITH WOR COMPONENTS! (PROVIDED BY <br /> 1/4"-V-1 �I I QUICK DISCONNECTS �i z:SO.L�YYA�P¢0R IOE7(T[i�J1CTICN CONTRACTOR) <br /> � WU (R. <br /> ) <br /> N r ST 7 AC ANCHOR EQUIPMENT TO ASPHALT <br /> 4.aILLrnON AIR VALVE <br /> SVF11f —1 —3'-31 Q 5.CCwmL PANEL / <br /> TYPICAL OF THREE SVE <br /> SVE-3'-310 LEVEE sYrtTCH (PROFB <br /> €stk WITH CATnxi i L—E--"—S""—E——E"' <br /> G ELECTRICAL MUN Acro <br /> k <br /> n SEPARATOR TANK € METER BASE FROM <br /> 511E-2"-3Q❑ CONDENSATE COLLECTOR TEMP. POWER POLE <br /> BURGESS-MANNING MODEL NO. W33-3 (SUPPLIED WITH CATOX UNIT) I <br /> TIurRzQQffwLl <br /> MELD-AWLISTABL.E 11WM TO TO 9E iNST&LEO AT A LATER DATE <br /> CONTROL SOV-211. CATOX <br /> SOIL-VAMR EXTRA nON SYSMM uNrA€i us VALVE I Ta EQRPAMON <br /> i <br /> 5-Ti P€SG1Lz AND MREE <br /> W-e <br /> AS-1/2"-310 s <br /> THREADED JOINTS ONLY sov-211 SPARGE COMPRESSOR <br /> TO BE STUBBED UP IN THE MANIFOLD <br /> TO BE INSTALLED AT A LATER DATE <br /> INSRUMEJTATION ANC PIPE SFECIF1C11T10Ns <br /> ff-4 <br /> SPECIFICATION <br /> MCKWM CARR PRN 41DOX25 <br /> 0-100 SMthr WC 3.5—INCH GAUGE <br /> ROTRCN AIR FLOW METER NOTES <br /> MODEL NO. FM20A1750; FLOW RANGE:35-175 SCFM AS-1/2'-300 1. STRATUS PROVIDED CONTRACTOR INSTALLED <br /> TI--1 McuASIER GRR PRN 391OK5l (3/4-INCH NPT) THREADED JOINTS ONLY 2 CONTRACTOR TO PURCHASE AND INSTALL ALL INSTRUMENTATION <br /> -4CF TO 11OF ARMORED GLASS THERMOMETER 3. CONTRACTOR TO PROVIDE AN INTEGRAL AND OPERATIONAL SYSTEM <br /> TI-2 M€KdAM CARR PRN 3010X52 (3/4-INCH NFT) SPARGE WELL AS-1 4. CONTRACTION TO SUPPLY AND INSTALL APPROPRIATE FITTINGS <br /> -40F TO 110F ARMORED cLASs mERMaMETTR 5. ALL ABOVE. GROUND PIPING TO BE SCH BO PVC AND ALL VALVES <br /> SVE-3'-310 SOIL VAPOR ERRACTSCN-3 INCH PYC PIPE-SCH. (TO SHALL HAVE TRUE UNIONS, <br /> SW-3•-30C SOL VAPOR EITIRACT€0N-41 INCH PVC PIPE-SCH, 40 SYS�M S. PROVIDE UNISTRUT SUPPORT TO PIPING AND EQUIPMENT AS NECESSARY <br /> g USA GASOLINE CORPORATION FIGURE <br /> 3 USA SERVICE STATION NO. 65 <br /> f�fr , +fit 2500 WEST LODI AVENUE m--- 1 <br /> LODI, CALIFORNIA PROJECT N0. <br /> PROCESS FLOW AND INSTRUMENTA'nON DIAGRAM 2007-0065--01 <br />