Laserfiche WebLink
S MP <br /> WEGE WELL CONSTRUCTION LOG <br /> PROJECT NAM€- PETROLi=1.lM— MONITOR WELL NUMB Mw 8 <br /> STATION #65 TOP OF CASING ELEVATIQN— <br /> PROJECT NUMBE WORK PLAN DATE COMPLETED <br /> WELL TYPE GROUND WATER MONITORING WELL <br /> REMARKS- <br /> TYPICAL MONITORING <br /> WELL <br /> WELL CONSTRUCTION <br /> 7 <br /> - - --- -- ----- 1 Total Depth of hole 60 <br /> 2 Diameter of boring <br /> a' <br /> B 3 Casing length 60' <br /> 5 4 <br /> 4 Diameter of casing 2.. <br /> 5 Depth to top of screen 35' <br /> -- s--- --- - - 6 Length of screen 25' <br /> i0 <br /> - - - screen interval 60' TO 35' <br /> screen type mktee°T,Pvc <br /> n i screen size O 02" <br /> 3 1 5' TO 5' <br /> 7 Surface seal <br /> seal material CONCRETE <br /> 6 <br /> 11 <br /> 8 Backfill 1 5' TO 29' <br /> _ seal material NEATCBIEN WITH <br /> 9 Upper seal SEE 7 <br /> t seal material <br /> 10 Lower seal 30' TO 29' <br /> i _______ seal material <br /> 211 Annulus 30' TO 60' <br /> material *31vIoN TEFeysAnD <br /> NOTE:Each well constructed with poly-vinyl chloride (PVC) <br /> casing with threaded bottom caps and threaded top caps <br /> } Also, PVC steam cleaned before constructing each well <br /> 3 Traffic boxes are water tight and locked for security <br /> E <br /> r <br /> 4 <br />