My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003891
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0003891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:48:14 PM
Creation date
3/5/2020 4:43:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003891
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��- 1386 EAST BEAMER STREET 3 <br /> WEGE ESTERN WOODLAND, CA 95776-6003 <br /> ` GEG-ENGINEERS <br /> FAX (916) 662-0273 j <br /> (9 6) 668-5300 <br /> CALIF CONTRACTOR# 513857 A CORPORATION <br /> REGISTERED GEOLOGISTS <br /> SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> Owners Name : USA "Petroleum Corporation, Station 65 <br /> Site Adress : 2500 W. Lodi Avenue, Lodi., CA Sec . 10; T3N; R6E : <br /> _r <br /> 10'1 <br /> ,.__..�... ...I T .. C- nr�mcYr eti <br /> 111.13& 1; CVLi1CL VL i.JV" t%VCllue aalu uvn�.i�. .�ca..+a.a..v.....+ <br /> Road. <br /> Other Information Past studies of this site indicate petroleum <br /> hydrocarbon contamination in the soil and ground water <br /> S1 and S2 , ground water monitor wells at this site are nearby to <br /> the proposed installation of this monitor well , they are dry. The <br /> construction of this monitor well is to establish a sampling point <br /> in the area, this well will augment data from the existing MW' s. <br /> KEY PERSONNEL AND RESPONSIBILITIES <br /> Consultant on Site Western Geo-Engineers <br /> 1386 E Beamer Street <br /> Woodland, CA 95695 <br /> (916) 668-5300 <br /> Project Manager. Vern Bennett <br /> Site Safety Officer: Vern Bennett <br /> ENTRY OBJECTIVES <br /> Type of Facility. Active Gasoline Service Station <br /> Site Activities : Drill one ground water monitoring well with <br /> an eight inch hollow stem auger in underground <br /> tank area. <br /> y <br /> i <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.