Laserfiche WebLink
FIRST QUARTER,1998 , <br /> GROUNDWATER MONITORING REPORT • <br /> USA STATION#65-LODI <br /> FEBRUARY,1998 ' <br /> 7.0 PREPARATION OF REPORT <br /> Firm Preparing Report ' <br /> GHH Engineering, Inc <br /> 8084 Old Auburn Road, Suite E <br /> Citrus Heights, Cahfornua 95610 <br /> Prepared b ' <br /> Report epa :y <br /> This report was prepared by GHH Engineering, Inc Mr Richard J Zipp, Principal Hydrogeolognst, <br /> is the qualified person responsible for overseeing this project This report was written by Ms <br /> Kathleen A Waldo, Staff Engineer, and reviewed for technical content by Mr Vern A Bennett, ' <br /> Project Manager, and Mr Zipp <br /> The analyses, conclusions and recommendations submitted in this report are based upon the best ' <br /> available information obtained from the field investigation, persons knowledgeable about the site, and <br /> local government agencies However, regulatory agencies may have additional recommendations <br /> after they have reviewed and evaluated the data This report was prepared to assist USA in the <br /> evaluation of the site <br /> This report has been reviewed by the client and they are responsible for the findings herein If you ' <br /> have any questions or need additional nnforinatnon please call the undersigned at (916) 723-1776 <br /> Thank You, <br /> Vern A Bennett �-� r /g' r , <br /> Project Manager \ZEL3 Ge Snkanth Dasappa Date <br /> 10 USA Gasohne Corporation ' <br /> r ({� RiCHAiaD <br /> ZkRP <br /> Richard Jp, R G, H No X75 <br /> Principal Hydrogeologist CE T1';iEa <br /> is HYDROGI-OLOGIST \� 1 <br /> F 15059 111KW1naj1Feb98 Q SOF CX-\� � <br /> 1 <br /> r <br /> 6 <br /> 1 <br />