My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003909
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0003909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:46:34 PM
Creation date
3/5/2020 4:50:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003909
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
USA Gasoline Corporation has installed 10 monitor wells in the <br /> course of the investigation of this site Six of these wells are <br /> located within the USA property boundaries and four wells are <br /> located to the south in a downgradient direction (see Figure 3 ) <br /> After the existing wells were in place (excluding MW8) , a Problem <br /> Assessment Report was prepared December 5, 1989 This report was <br /> included in Appendix A of the Quarterly Monitoring Report of <br /> September 24 , 1991 It presented Soil Boring analysis , Ground <br /> water analysis, Ground water flow direction, Aquifer test data <br /> with an estimate of transmzssivity and hydraulic conductivity, <br /> and an evaluation of the zero line of contamination <br /> On February 8 , 1993 , MW8 was installed eight feet southeast of <br /> the tank field This location was in a hydraulic downgradient <br /> direction from the tank field (see Figure 3 ) A Limited Drilling <br /> Report was prepared on February 25 , 1993 to document the methods <br /> and procedures used to construct the well That report was <br /> included as Appendix C of the May 4 , 1993 Quarterly Monitoring <br /> Report The well was sampled for the first time on March 31 , <br /> 1993 <br /> Western Geo-Engineers was contracted by USA Gasoline Corporation <br /> to perform a one day Vapor Extraction Feasibility Test On March <br /> 14 , 1995 four monitor wells were tested, MW4 , S1, S2 and MW8 , the <br /> results from this limited test suggests that Vapor Extraction <br /> (V E ) is a viable mitigation technique for this site The <br /> . findings are presented in the ' Results of Pilot Test for Vapor <br /> Extraction' report dated April 17 , 1995 <br /> USA Gasoline Corporation is currently undergoing the preparation <br /> of a Remedial Action Plan for this site and will commence <br /> corrective action upon concurrence and notification from the <br /> regulatory agency (s) of their proposal <br /> GEOLOGY <br /> The deposits under the site are Recent to Pleistocene age <br /> alluvium and consist of lenticular silt, sand, gravel and clay <br /> representing a heterogeneous fluvial environment The Problem <br /> Assessment Report for this site (Appendix A of the Quarterly <br /> Monitoring Report for September 24 , 1991) details the local and <br /> regional geology and hydrogeology The soil samples and drill <br /> cuttings from MW8 indicated similar lithologies to those <br /> presented in the Problem Assessment Report <br /> HYDROLOGY <br /> Ground water elevations at the site ranged between 5 and 6 feet <br /> below sea level from January 20 , 1989 to April 18 , 1989 From <br /> April 18 , 1989 through September 13 , 1991 , ground water <br /> 2 USA 65 Sept 195 Qtr Rpt <br />
The URL can be used to link to this page
Your browser does not support the video tag.