Laserfiche WebLink
PAGE 2 OF 2_ <br /> y <br /> NrESTE/P1VGE0ENGINEERS BORING: MW 8� DATE DRILLED: 2-8-93 <br /> SAMPLE INTERVAL <br /> BORE HOLE LOG ®WATER <br /> r <br /> PROJECT: GEOLOGIST: SURFACE <br /> USA PETROLEUM CORP.'STA. 65 V. BENNETT ELEVATION: <br /> LOCATION: DRILLER: TOTAL DEPTH: <br /> 2500 W. LODI AVE., LODI, CA E. FORSSTROM 60' <br /> DRILLING CONTRACTOR: DEPTH TO CASING: <br /> WOODWARD DRILLING CO. WATER: 55' 2„ <br /> REMARKS:8" HOLLOW STEM AUGUR POWERED BY MOBILE DRILLING RIG, B-57 <br /> 140# DROP HAMMER FOR SAMPLING, HAND AUGURED TO 5' W/ 8" AUGUR. <br /> Z LL n o <br /> L d J <br /> = J CORE DESCRPTION REMARKS <br /> o CL <br /> LL CE -' <br /> o cnCo <br /> Sd: crs-med, prly sorted, no odor,wet Total Depth <br /> i redbrn clasy matrix (SP) `" 60' <br /> 60' MW8- 22, 0pm Clay: It gry-mottled brn, wet, no odor, <br /> m 5016" lean (CL) completed-618193 <br /> — 2" GW monitoring <br /> D Ge ,0 <br /> well <br /> JACK E. <br /> NAPPER ' } <br /> No. 303.7 <br /> OF 0�� <br /> NOTE: PID CALIBRATED WITH 50 PPM <br /> BENZENE FROM CALIBRATIION GAS <br /> i <br /> } <br /> • <br />