My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013035
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0013035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 6:10:49 PM
Creation date
3/5/2020 4:58:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013035
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> directly from the surface to the sampling interval. The hydropunch is conveyed to the <br /> %owl bottom of the boring using drill rods. Once on bottom the hydropunch is driven a <br /> maximum of five feet. The tool is then opened by lifting up the drill rod no more than <br /> four feet. Once the tool is opened, water enters and a sample can be collected with a <br /> bailer or tubing utilizing a peristaltic pump. Soil particles larger than silt are prevented <br /> from entering the tool by a screen within the tool. The water sample is collected, labeled, <br /> and handled according to the Quality Assurance Plan. <br /> Monitoring Well Installation <br /> Monitoring wells will be completed by installing 2- to 6-inch-diameter Schedule 40 <br /> polyvinyl chloride (PVC) casing. The borehole diameter for a monitoring well will be a <br /> minimum of four inches larger than the outside diameter of the casing. The <br /> 2-inch-diameter flush-threaded casing is generally used for wells dedicated for <br /> groundwater monitoring purposes. <br /> A monitoring well is typically cased with threaded, factory-perforated and blank <br /> Schedule 40 PVC. The perforated interval consists of slotted casing, generally with 0.01 <br /> or 0.02 inch-wide by 1.5-inch-long slots, with 42 slots per foot. The screened sections of <br /> casing are factory machine slotted and will be installed approximately 5 feet above and <br /> 10 feet below first-encountered water level. The screened interval will allow for seasonal <br /> fluctuation in water level and for monitoring floating product. A threaded or slip PVC <br /> cap is secured to the bottom of the casing. The slip cap can be secured with stainless <br /> steel screws or friction; no solvents or cements are used. Centering devices may be <br /> fastened to the casing to ensure even distribution of filter material and grout within the <br /> borehole annulus. The well casing is thoroughly washed and/or steam cleaned, or may be <br /> purchased as pre-cleaned, prior to completion. <br /> A filter pack of graded sand will be placed in the annular space between the PVC casing <br /> and the borehole wall. Sand will be added to the borehole through the hollow stem of the <br /> augers to provide a uniform filter pack around the casing and to stabilize the borehole. <br /> The sand pack will be placed to a maximum of 2 feet above the screens, followed by a <br /> minimum 1-foot seal consisting of bentonite pellets. <br /> Cement grout containing 5 percent bentonite or concrete will be placed above the <br /> bentonite seal to the ground surface. A concrete traffic-rated vault box will be installed <br /> over the monitoring well(s). A watertight locking cap will be installed over the top of the <br /> well casing. Reference elevations for each monitoring well will be surveyed when more <br /> than two wells will be located on site. Monitoring well elevations will be surveyed by a <br /> California licensed surveyor to the nearest 0.01-foot relative to mean sea level (MSL). <br /> Horizontal coordinates of the wells will be measured at the same time. <br /> Exploratory boring logs and well construction details will be prepared for the final <br /> written report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.