My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
100
>
2200 - Hazardous Waste Program
>
PR0513680
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 10:54:04 AM
Creation date
3/6/2020 10:10:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513680
PE
2220
FACILITY_ID
FA0009162
FACILITY_NAME
SUSD EDISON HIGH SCHOOL
STREET_NUMBER
100
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16502008
CURRENT_STATUS
01
SITE_LOCATION
100 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mercury Disposal System,Inc. Invoice <br /> (714) 505-6100 <br /> 14731 FRANKLIN AVE. UNIT G Date Invoice# <br /> TUSTIN,CA 92780 6/1/2011 16479 <br /> Bill To Ship To <br /> Stockton Unified Scho I District Stockton Unified School District <br /> 1944 N.EI Pinal Drive 1944 N.EI Pi"Drive <br /> Stockton,CA 95205 Stockton,CA 95205 <br /> (209)933-7045 ext.2148 (209)933-7045 ext.2348 <br /> P.O. Number Terms Rep Ship Via F.O.B. Ship To: <br /> 1. Net 15 U 6/15/2011 UPS <br /> Quantity ItemCode Description Price Each Amount <br /> 29,024 Recycling Fees Recycling Fees Per Foot/4 FT.LAMPS,7,256 EACH- 0.125 3,628.00 <br /> 29,024 FEET <br /> 1,200 RecyclinFees Recycling Fees Per Foot/6 FT.LAMPS,200 EACH-1,200 0.125 150.00 <br /> FEET <br /> 1,280 Recyclin Fees Recycling Fees Per Foot/8 FT.LAMPS, 160 EACH-1,280 0.125 160.00 <br /> FEET <br /> 79 RecyclinFees Recycling Fees CAPACITORS 1.10 86.90 <br /> 2,106 Recyclin Fees Recycling Fees Per LB/NON PCB BALLASTS 0.28 589.68 <br /> 94 Recyclin Fees Recycling Fees Per BULBMID LAMPS 1.29 121.26 <br /> 39 Recycling Fees Recycling Fees Per BULB/U SHAPED LAMPS 0.49 19.11 <br /> 17 Recycling Fees Recycling Fees Per BULB/PROJECTOR LAMPS 0.89 15.13 <br /> 656 Recycling Fees Recycling Fees Per BULB/CFL LAMPS 0.49 321.44 <br /> 1 Freight Freight/PICK UP 50.00 50.00 <br /> MDS,Inc. <br /> Certifies acceptance of the material referenced in this <br /> �y PPROV D ru' document <br /> �j�" [� The material will be recycled in accordance with the United <br /> 0. f States Environmental Protection Agency and State of <br /> T California Environmental Protection Agency Waste <br /> /G 6l Management Regulations <br /> Sales Tax 7.75% 0.00 <br /> COPY Total � <br />
The URL can be used to link to this page
Your browser does not support the video tag.