Laserfiche WebLink
10 September.2001 : <br /> AGE-NC Project No. 98=0497 <br /> Page 5 of 5 <br /> of monitoring wells are presented in AGE's]Monitoring ell Instdllation Work Plan, dated 05 June <br /> -2000, and were approved by the PHS-EHD by letter dated 15 June 2001. The same procedures will, <br /> be-utilized.-for the current phase of.work. A proposed monitoring well construction diagrarzi is <br /> depicted in Figure 6. <br /> 3.3: REPORT PREPARATION <br /> Upon completion of field work•and receipt' of final lab ratory analysis; a report will be prepared, <br /> describing the work performed and_ will include findings,", conclusions _ and applicable <br /> recommendations. All laboratory reports for sample an yses; testing.methods, laboratory quality. <br /> assurance/quality control (QA/QC} reports, and sarnp chain.of custody documentation will be <br /> included with the.:report. The report .will be in a-fohnai acceptable to the.PHS-EHD and the <br /> CVRWQCB, and will be,reviewed and sighed by a.Cal' bmia Registered Geologist. <br /> Advanced GcoEnvironmenta],Inc. - <br />