Laserfiche WebLink
t28 April 2006 <br /> . AGE-NC Project No 98-0497 <br /> ' Page 4 of 4 <br /> ' The second quarter 2006 monitoring event is scheduled for May 2006 <br /> • In order to evaluate the stability of the dissolved TPH-d in the ground water, capillary zone <br /> and smear zone, AGE recommends the performance groundwater removal from MW-1 A <br /> ' batch of approximately 4,000 to 6,000 gallons of ground water should be removed from well <br /> MW-1 to monitor for a rapid or substantial decline in the dissolved TPH-d mass <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> ' upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points (i e , ground <br /> water samples)and subsurface conditions may vary away from these data points No other warranty, <br /> ' expressed or implied,is made as to the professional interpretations,opinions,and recommendations <br /> contained in this report <br /> 1 <br /> Advancer!GeoEnviron mental Inc <br />