Laserfiche WebLink
13 January 2006 <br /> AGE-NC Project No 98-0497 <br />' Page 4 of 4 <br />' 5.0. RECOMMENDATIONS <br /> Based on the results of this and previous investigations, AGE recommends the continuation of <br />' quarterly monitoring and sampling of the ground water well network The first quarter monitoring <br /> event is scheduled for March 2006 <br /> G.O. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br />' conditions at the site have been made from a limited number of available data points (i e , ground <br /> water samples)and subsurface conditions may vary away from these data points No other warranty, <br /> expressed or implied,is made as to the professional interpretations,opinions,and recommendations <br />' contained in this report <br /> Advanced GeoEnvfronmental,Inc <br />