Laserfiche WebLink
' . czt-15-97 04:49P shci-11 01 P.04 <br /> -�p f�(-p 7��Yy /a� <br /> Mr. Ron Rowe C.M113RIA <br /> October 15, 1997 <br /> • Soil and water disposal methods, <br /> • A discussion of the hydrocarbon distribution,and <br /> • If more than one well is installed,two cross-sections will be included,one perpendicular to ground � <br /> water flow, and one a]Qng the ground water flow direction. <br /> SCHEDULE <br /> Upon receiving written work plan approval from the SJCPHS, Cambria will schedule the field words. <br /> Cambria will submit an investigation report approximately six weeks after completing the field work.We <br /> appreciate the opportunity to work with you on this project. Please call if you have any questions or <br /> continents_ <br /> Sincerely, <br /> I <br /> Cambria Environmental Tedhnology, InC. <br /> Q . <br /> Owen C.Ratchye,P. <br /> Project Engineer <br /> KIWed B.Rahman,R.G.,C.H.G. <br /> Senior Geologist <br /> 1L4exveK_*ivtu*o1ECSHfflX\RM4IXConrvvnd—c6WkPln_Add_2_WPIJ <br /> cc: Mr_A.E.(Alex)Perez,Shell Oil Products Company,P.O.Box 8080,Martinez,CA 94553 <br /> I <br /> I <br /> 4 <br /> i <br />