Laserfiche WebLink
i <br /> I <br /> 341 E. Main Street <br /> Page 2.of 2 <br /> • A workplan to advance at least one c <br /> p onfirmation borin on the site-preferably <br /> � p by <br /> locating the borehole close to CPT-1 for direct comparison of new and old soil <br /> analytical data so that attenuation treads may be shown with a higher degree of <br /> certainty. Please note that the number of confirmation borings should be chosen <br /> to.provide sufficient data to demonstrate a reduction of MTBE mass, assess the <br /> risk MTBE currently poses to human health .and to groundwater, and model <br /> future reduction of the vadose zone MTBE mass to background conditions. (If <br /> MTBE is found to be absent or present in minimal .concentrations, the latter <br /> points become moot.) <br /> EHD does not have the report that discusses the installation of monitoring wells MW-4A, <br /> MW-4B, MW-5A, MW-513, MW-6A, MW-6B, nor the laboratory analytical data for <br /> groundwater samples collected at CPT-12 and CPT-15. Please resubmit the report that <br /> documents the installation of these wells and includes the boring logs, and also resubmit <br /> the laboratory groundwater analytical results for CPT-12 and CPT-15. <br /> If you have any questions please contact Vicki McCartney at (209) 468-3456 or by <br /> electronic mail at vmccartney@sjcehd.com. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> I <br /> Victoria L. McCartney, Senior REH Nuel C. Henderson, Jr., P -�- <br /> LOP/Site Mitigation UAit IV LOP/Site Mitigation Unit IV <br /> c: Joe W. Neely, PG-Cambria <br /> James L.L. Barton, PG-CVRWQCB <br /> Matt Machado-City of Ripon <br /> Jeanne Zolezzi-Herum,"Crabtree, Brown <br /> I <br /> i <br /> I <br /> I <br /> II <br /> I <br />