My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 1:49:51 PM
Creation date
3/6/2020 1:32:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> Shell Sites <br /> Page 3 <br /> i <br /> 6131 Pacific Avenue, Stockton <br /> A Remedial Action Plan was to be submitted on November 21,2005. Shell is in the process of <br /> obtaining permits from OMI (City of Stockton) for disposal of extracted groundwater and Air <br /> Pollution Control for discharge of treated extracted vapor to the air from the interim and permanent <br /> dual phase extraction (DPE) system. Shell expects to have the DPE equipment on site in January <br /> 2006. <br /> i <br /> 3725 Tracy Blvd,Tracy <br /> An SCM is being prepared for this site. Batch extraction of ground water was performed and results <br /> of quarterly groundwater sampling have shown no rebound of contaminants. Chevron has a <br /> monitoring well cross gradient from the Shell site that has about 300 ug/1 of MTBE so Shell may <br /> need to place a monitoring well between the two sites. To justify closure of the site Shell should <br /> contour or otherwise utilize the Chevron and Shell data to show the MTBE is not from Shell. <br /> 880 Victor Road,Lodi <br /> A temporary groundwater extraction system has been in operation since September 29,2005. <br /> Information on extraction of water from MW2 (4 inch well) and MW4 (6 inch well)will be included <br /> in the next quarterly report. Installation of additional on-site monitoring wells and a soil boring were <br /> performed November 21 through 28,2005. <br /> 4315 Waterloo Road, Stockton <br /> The work plan submitted on July 5,2005,was approved by EHD on November 9,2005. The work <br /> is scheduled to be performed on December 12 through 16,2005. <br /> 1160 Yosemite Avenue,Manteca <br /> An SCM is to be prepared and Shell may be able to justify closure of the site. <br /> If you have any questions or comments please contact the appropriate LOP staff overseeing the site <br /> or call me at(209) 468-3449. <br /> Donna Heran,REHS,Director <br /> Environmental Health Department <br /> Margaret Lagorio, Supervising REHS <br /> Site Mitigation Unit <br /> c: CVRWQCB—James L.L. Barton,RG <br /> Cambria—Joe Neely,Aubrey Cool <br /> i <br /> I� <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.