Laserfiche WebLink
ENVIRONMENTAL HEALTH EPARTME NT <br /> SAN JOAQUIN COUNTY <br /> 2 ?, Donna K.Heran,R.E.H.S. Unit Supervisors <br /> Carl Borgman,R:E.H.S. <br /> N Director 304 East Weber Avenue, Third Floor <br /> • Al Olsen,R.E.H.S. Stockton, California 95202-2708 <br /> Mike Huggins,R.E.H.S.,R.D.I. <br /> Program Manager Douglas W.Wilson,R.E.H.S. <br /> CgC�F.o,Ra�QTelephone: (209) 468-3420 Margaret Lagorio,R.E.H:S. <br /> Man <br /> Laurie A..Co R.E.H.S. Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Program Manager Mark Bareellos,R.E.H.S. <br /> DENIS L BROWN JUN 24 2005 <br /> SHELL OIL PRODUCTS <br /> 20945 S WILMINGTON <br /> CARSON CA 90810-1039 <br /> RE: SHELL Sites in San Joaquin County <br /> A meeting was held on June 9,2005,at the office of San Joaquin County Environmental Health <br /> Department(EHD). Attending the meeting were you representing Shell Oil,Joe Neely and Aubrey <br /> Cool representing Cambria Environmental Technology, Inc.,and Margaret Lagorio,Nuel C. <br /> Henderson,Jeff Wong,Harlin Knoll,Michael Infurna,Lori Duncan,and Vicki McCartney <br /> representing EHD. There was a general discussion about preparing cross sections that have <br /> lithological correlations with interpretations of the subsurface and including them in site conceptual <br /> models (SCM)prepared for each site. The following is a synopsis of the status and/or site specific <br /> discussions at the meeting. <br /> 3011 Benjamin Holt,Stockton - <br /> A third geologic cross section is to be prepared that extends from the contaminant source area to <br /> newly installed monitoring well MW13 and is to be included in an updated SCM. In the conclusions <br /> and recommendations of the August 14,2004,SCM,it was stated that MTBE was no longer a fuel <br /> component at this site,that concentrations of MTBE were declining and expected to continue <br /> declining and that case closure may be warranted. If this is the conclusion and recommendation of i <br /> the updated SCM, then a closure report should be prepared as discussed in the Tri-Regional Board <br /> Staff Recommendations dated April 16,2004. <br /> 1313 Charter Way.Stockton <br /> An SCM is to be prepared for this site and can be included in the next quarterly monitoring report. <br /> The contaminant of concern at this site is 1,2-DCA. If it can be demonstrated that the 1,2-DCA <br /> plume has been adequately characterized on-site and off-site and that action to remediate the mass of <br /> contamination is not necessary,then a closure report should be prepared as discussed in the Tri- i <br /> Regional Board Staff Recommendations dated April 16,2004. <br /> _620 Charter Way,Stockton <br /> The comments provided in the EHD letter dated May 18,2005,were discussed. It was agreed that <br /> CPT borings would be advanced and the data would be used to decide where monitoring wells <br /> would be installed. <br /> 440 Charter Way,Stockton <br /> It was stated that the off-site property owner had not responded to the access agreement request. <br /> Cambria will follow up on securing an access agreement and proceed with implementation of the <br /> work plan approved December 13,2004: <br /> 4 <br /> 5 <br />