Laserfiche WebLink
Mr. Ron Rowe <br /> June 29, 1998 CAMBRIA <br /> • Analytic reports and chain-of-custody forms, <br /> • Soil and water disposal methods, <br /> • A discussion of the hydrocarbon distribution, <br /> • Two cross-sections,one perpendicular to and one parallel to the assumed ground water flow direction, <br /> • Proposed additional ground water monitoring well location and design, and <br /> • Proposed periodic ground water extraction.program. <br /> SCHEDULE <br /> Upon receiving written work plan approval from the SJCPHS,Cambria will schedule the field work. Cambria <br /> will submit an investigation report approximately 45 days after completing the field work. We appreciate the <br /> opportunity to work with you on this project. Please call if you have any questions or comments. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Owen C. Ratchye, <br /> Project Engineer tiq. LU,y <br /> :A <br /> .00 <br /> N0. C46725 <br /> Diane Lundquist, P.E. s��T ClV11- <br /> Principal Engineer FCF CL�F�� <br /> Attachment A: CPT Field Protocol <br /> cc: Mr. A. E. (Alex)Perez, Shell Oil Products Company,P.O. Box 8080, Martinez, CA 94553 <br /> GARIP34I\Correspondence\Wkpin Add_3.wpd <br /> 4 <br /> i <br />