My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 1:48:30 PM
Creation date
3/6/2020 1:34:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> �✓ STANDARD FIELD PROCEDURES FOR MONITORING WELLS <br /> This document presents standard field methods for drilling and sampling soil borings and installing, <br /> developing and sampling ground water monitoring wells. These procedures are designed to comply with <br /> Federal,State and local regulatory guidelines. Specific field procedures are summarized below. <br /> SOIL BORINGS <br /> Objectives <br /> Soil samples are collected to characterize subsurface lithology, assess whether the soils exhibit obvious <br /> hydrocarbon or other compound vapor or staining, and to collect samples for analysis at a State-certified <br /> laboratory. All borings are logged using the Unified Soil Classification System by a trained geologist <br /> working under the supervision of a California Registered Geologist(RG). <br /> i <br /> Soil Boring and Sampling <br /> Soil borings are typically drilled using hollow-stem augers or direct-push technologies such as the <br /> Geoprobe®. Soil samples are collected at least every five ft to characterize the subsurface sediments and <br /> for possible chemical analysis. Additional soil samples are collected near the water table and at lithologic <br /> changes. Samples are collected using lined split-barrel or equivalent samplers driven into undisturbed <br /> sediments at the bottom of the borehole. <br /> Drilling and sampling equipment is steam-cleaned prior to drilling and between borings to prevent <br /> cross-contamination. Sampling equipment is washed between samples with trisodium phosphate or an <br /> equivalent EPA-approved detergent. <br /> Sample Analysis <br /> Sampling tubes chosen for analysis are trimmed of excess soil and capped with Teflon tape and plastic end <br /> caps. Soil samples are labeled and stored at or below 4°C on either crushed or dry ice,depending upon local <br /> regulations. Samples are transported under chain-of-custody to a State-certified analytic laboratory. <br /> Field Screening <br /> i <br /> One of the remaining tubes is partially emptied leaving about one-third of the soil in the tube. The tube is <br /> capped with plastic end caps and set aside to allow hydrocarbons to volatilize from the soil. After ten to <br /> fifteen minutes,a portable volatile vapor analyzer measures volatile hydrocarbon vapor concentrations in the <br /> tube headspace,extracting the vapor through a slit in the cap. Volatile vapor analyzer measurements are used <br /> along with the field observations, odors, stratigraphy and ground water depth to select soil samples for <br /> analysis. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.