My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004462
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0004462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 3:04:49 PM
Creation date
3/6/2020 1:42:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004462
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E <br /> List of Known Environmental Documents-341 E.Main Street,Ripon <br /> Date Prepared by Report Name <br /> April 22, 1996 Cambira Corrective Action Plan <br /> April 22, 1996 Cambria Corrective Action Plan Addendum <br /> July 25, 1996 Cambria Tank Removal and Soil Sampling Report <br /> July 11, 1997 Cambria Investigation Work Plan <br /> August 14, 1997 Cambria Res nse to Additional Investigation Request <br /> October 15, 1997 Cambria Investigation Work Plan Addendum <br /> April 28, 1998 Cambria Well Installation Report <br /> May 12, 1998 Cambria Addendum to Well Installation Report <br /> June 29, 1998 Cambria Investigation Work Plan Addendum#3 <br /> July 10, 1998 Cambria Investigation Work Plan Addendum#4 <br /> December 21, 1998 Cambria investigation Work Plan Addendum 05 <br /> August 17, 1998 Cambria CPT Investigation Report <br /> April 16, 1999 Cambria Monitoring Well and CPT Investigation Re ort <br /> July 7, 1999 Cambria Pump Test Investigation Report <br /> August 20, 1999 Cambria Investigation Work Plan Addendum 46 <br /> February 9,2000 Cambria Well Installation Report <br /> June 22,2001 Cambria Soil Vapor Extraction Feasibility Test Report <br /> 2Q98 to 1Q05 Cambria Quarterly Monitoring Reports <br />
The URL can be used to link to this page
Your browser does not support the video tag.